Past Projects

Boston Medical – Brockton Behavioral Health Center

Performed TAB services for medical faciltity. Work included duct pressurization testing, geothermal well pressure testing, air and hydronic balancing.

Federal Reserve Building Boston

Multiple contracted Test and Balance services for Facilities engineering department

EMD Serano – Billerica, MA

Provided TAB services for a new 149,000 square foot Building of office and lab space for research and development campus in Billerica, MA

Wheaton College – Old Science Center Renovation

Pre-demo survey and Test and Balance of newly renovated Science center.   HVAC systems supporting labs and offices

Lowell General Hospital

Performed TAB services under the direction of the Facilities department, work included surveys and establishing control set points for air and water systems.

Thermo Fisher – Chelmsford, MA

Performed Test and Balance services of laboratories and offices spaces.   Set up of energy recovery unit, Chilled water systems, laboratory exhaust, room pressurization.

Wellesley College New Science Center

Performed TAB services for Laboratory, Classroom and support areas.

Taunton Hospital DMH

Project Test and Balance services for renovation project.

Burrell Elementary School Foxborough, MA

Performed test and balance services on school renovation and addition.

University of Rhode Island – Ranger Hall DALT

Duct leakage testing for the Ranger Hall renovation project.

Charles River Labs – Shrewsbury, MA

Laboratory Test and Balance services   Ventilation rates set for pressurization Air change calculations performed

American Test and Balance is available to work with you, contact us today!